A bridge for high-speed trains. Construction of the new Storstrøm Bridge. Ny invitation er udsendt. DDO, COWI This drawing is printed on 08-07-2014-12:46:21 This drawing is printed on--- … The contract for construction was awarded in February 2018 to the Italian Consortium led by Itinera S.p.A, comprising GLF and Condotte, and named SBJV, Storström Bridge Joint Venture. Daniel Krøyer ist bei Facebook. It is on the rail line between Copenhagen and Hamburg, Germany. Rettelse Dato Projekteret Kontrol Godk. It will have a width of 12.1m for the railway and emergency paths, 3.5m each for two traffic lanes, 2.5m for the two-way bicycle track, and 0.3m for the addition of two railings. The crane weighs approximately 1,500 tonnes, with the 2 large horizontal girders weighing about 320 tonnes each. Tritt Facebook bei, um dich mit Daniel Krøyer und anderen Nutzern, die du kennst, zu vernetzen. The new Storstrøm Bridge will be approximately 4 km long which makes it the 3rd longest bridge in Denmark. The sand is pumped in from a special vessel – a so-called sand extractor – and via a pipeline into land. An Italian joint venture has won the construction contract for Denmark’s replacement 4km-long road and rail Storstrom Bridge. Together with a new Masnedsund Bridge, the Storstrøm Bridge was planned and constructed between 1932 and 1937. Vejdirektoratet.dk understøtter ikke denne browserversion og der kan derfor være elementer, som ikke vises korrekt. Budget: DKK 4.2 mia. The bridge will have a length of 3,840m between the abutments. Fehmarn Belt Fixed Link. The single-track rail line of the bridge is adequate to meet the demand for passenger as well as freight transport. Klubledermødet er flyttet til den 1/12-2018 kl. The joint venture contract team for the new bridge construction is made up of Itinera, Condotte and Grandi Lavori Fincosit, with Seteco Ingegneria as consultant. Storstrømbroen . Storstrøm Bridge consortium in the spotlight over financial troubles The contract for one of the biggest upcoming infrastructure projects – a new bridge over Storstrøm – could be in jeopardy The new bridge will replace the one that has been there since 1937 (photo: flickr/News Oresund) T​he Danish Road Directorate is constructing a new Storstrøm Bridge, which connects Zealand to Falster through Masnedø. Karte mit dem geplanten Fehmarn Belt Fixed Link im dänisch-deutschen Autobahnsystem. The precipitated sand can then be transported to the destination in the dam. The bridge will be approximately 4 km long, and is the 3rd largest bridge in Denmark. It is 60 metres wide at each joint and 28 metres high. The bridge, which replaces an older one, has been designed by Dissing & Weitling and will carry rail and road, as well as making provision for pedestrians and cyclists. In the 1930s, there was active lobbying in Danish industrial circles for a direct line from Germany up into Scandinavia. Invitation kommer. is inclusive demolition of the old bridge. When the mixture has come ashore, the water is led back into Storstrømmen, while the sand remains. You can Deny consent to all cookies or Accept. The new cable-stay bridge will carry a two-lane highway allowing for a maximum speed of 80km/h, and a double-track electric railway with the capacity for speeds of up to 200km/h. The Storstrøm Bridge is a road and railway arch bridge that crosses Storstrømmen between the islands of Falster and Masnedø in Denmark. The Bridge was handed over to the Client and opened to traffic on 26th September, 1937. E-mail: ng@vd.dk Danish company EKJ Rådgivende Ingeniører is also working with the team. Fehmarn Belt Fixed Link - Fehmarn Belt Fixed Link. The initial work of excavating the seabed has been going on since the beginning of the year, and in May the establishment of the actual dam began. Opdater venligst din browser, for at få den fulde funktionalitet. Following the construction of the Fehmarn Belt fixed link between Denmark and Germany, the current single track section would be the only remaining bottleneck in the rail freight line between Scandinavia and Central Europe. Jacob Duschek kommer og fortæller om de nye Bridgelove. All the piers were constructed inside steel cofferdams. Distriktshold er pÃ¥ grund af fÃ¥ tilmeldinger udskudt til at starte pÃ¥ 2. spilledag den 8. december 2018. It was the main road connection between the islands until the Faro Bridges were opened in 1985. Aus Wikipedia, der freien Enzyklopädie. The temporary dam consists of approximately 30,000m3 of sand from the seabed at Agersø in the Great Belt. With the dam in place, excavations can be made for the foundations of one of the bridge’s pillars to be cast. For more information, click here. The bridge also plays an important role on a regional and local level. The existing bridge will be dismantled once the new bridge is ready for use in 2022. Floor 2, 1 Livsey Street, Rochdale, Greater Manchester, OL16 1SS, United  Kingdom, Tel: +44(0)1706 719972       Fax: 0845 458 4446. The Storstrøm Bridge is an important link on the railway connecting Scandinavia to Germany and the rest of Europe through the Fehmarn Belt Link. Storstrøm Bridge project details The existing Storstrøm bridge, which was constructed in 1937, is in a poor state without the feasibility for repair. The Italien Joint Venture SBJV has established itself in Vordingborg. Moreover, the bridge's single-track rail line is not up to today's demand for passenger and freight transport. A further milestone was achieved in May 2020, when a dam off the coast of Masnedø was completed. It will include a two-way bicycle or foot track. Following the construction of the Fehmarn Belt fixed link between Denmark … 3rd longest bridge in Denmark. Once completed, it will attract passenger and freight traffic estimated at 30-35,000 trains a year. The project is currently under construction. It is expected to be used by more than 8,000 vehicles a day by 2025. Construction of the new Storstrøm Bridge. Web: The Danish Road Directorate, The Road Directorate Finden Sie perfekte Stock-Fotos zum Thema Foundations Illustration sowie redaktionelle Newsbilder von Getty Images. The Storstrøm Bridge was an old dream for the Danish State Railways who wanted a rapid link via the Gedser-Warnemünde ferry to the rest of Europe. Construction of the new Masnedsund Bridge. English: Storstrøm bridge connecting the island of Masnedø with the larger island of Falster in south east Denmark. The Danish Road Directorate expects to choose five pre-qualified consortia for the Storstrom Bridge project in May and the bids for the project are scheduled to be submitted by April 2016. The Storstrøm Bridge connects Zealand with Falster via Masnedø and will form an important part of the upgrading of the railway line between Copenhagen and Rødby, and further on to the Fehmarn Belt Link to Germany. EUR 560 million and will open for traffic in 2022. Storstrom Bridge Design. The bridge, which replaces an older one, has been designed by Dissing & Weitling and will carry rail and road, as well as making provision for pedestrians and cyclists. Koordinaten: 54 ° 34'40 "N 11 ° 17'50" E  /. Earlier this year, a major step was completed when the assembly of a large floating crane, which will be used to lower the prefabricated bridge foundations into place, was completed. When the first two bridge sections from Masnedø are completed, the temporary dam will be removed. Aus Wikipedia, der freien Enzyklopädie. The new double track bridge will replace the single track bridge built in 1937, which will be demolished afterwards. The original Storstrøm Bridge, which was constructed in 1937, is in a poor state and beyond repair. 932 MASNEDØ - FALSTER 93200 STORSTRØMSBROEN Kort- og Matrikelstyrelsen og Vejdirektoratet KOORDINATSYSTEM: SSBKP/DVR90 Rev. The construction of the bridge in combination with a new high speed railway line will reduce travelling time. Ennio Buson, Project Manager  54,577725 ° N 11,297208 ° E.  / Koordinaten: 54 ° 34'40 "N 11 ° 17'50" E.  /. The Danish Road Directorate is in charge of the construction of the new Storstrømsbro and the demolition of the existing bridge. In other projects. Click to share on Twitter (Opens in new window), Click to share on Facebook (Opens in new window), St. Modwen signs second round of lettings at Chamberhall Business Park, End of the line for construction as A66 Keswick to, University steams ahead with heritage award for former, WeBuild starts works ahead of time on Verona-Padua, Alstom’s hydrogen train successfully completes, Alstom to supply Italy’s first hydrogen trains, Five triumph as next phase of railway station design. A new bridge will create an efficient new high speed rail-link between Scandinavia and Germany. The mixture consists of 20 percent sand and 80 percent water. Type of Construction The Masnedsund Bridge is supported on two abutments and five piers, one of which contains the machinery for the bascule bridge. Due to be completed in 2022, the bridge will provide easy access to the rest of Scandinavia in the north, as well as to the south through the Fehmarn Belt Tunnel. The design proposal presented by SBJV, was conceived and developed by de Miranda Associati/DMA during the Tender Phase. The bridge also plays an important role on a regional and local level. The bridge, which is part of the planned Fehmarn Belt link between Denmark and Germany, has a budget of approx. New Storstrøm Bridge attracting international construction giants Virksomheden er et interessentskab i branchen gennemførelse af byggeprojekter. E-mail: ng@vd.dk All concrete elements for the large bridge construction project are being cast locally on Masnedø, where CSK has built four production halls for the purpose. The new double track bridge will replace the single track bridge built in 1937, which will be demolished afterwards. New railway bridge across Masnedsund. The Masnedø-Falster ferry service was a bottleneck until a construction act was passed in 1931. This will reduce congestion on the Great Belt route across Denmark and on the rail line in question. The Storstrøm Bridge was the result of the Danish State Railways' mission to get more traffic across the Baltic Sea via the Gedser-Warnemünde ferry route. The preferred solution is a new, combined railway and road bridge, with a gently curved alignment that compliments the surrounding landscape, but also forms a dynamic shape that connects the two shores of Masned Island and Falster. Digitalization in infrastructure is an important and growing area of the RINA business and a vital part of improving the safety of these major constructions in modern society.” RINA provides a wide range of services across the Energy, Marine, Certification, Transport & Infrastructure and Industry sectors. The Danish Road Directorate (Vejdirektoratet), a part of the Danish Ministry of Transport, is responsible for the construction of the bridge. Storstrøm Bridge project. The third largest bridge in Denmark, the 3.84km Storstrøm Bridge is under construction in a complex $625.7million project which will connect Zealand and the island Falster via Masnedo. The Premier Information Tool for the Construction, Hospitality, Rail and Retail Industries! torstrm ridge project 9320 torstrø ridge September 2014 Revision 1 Technical description for the technical dialogue for the Web: The Danish Road Directorate, Construction and infrastructure investment opportunities in Greater Copenhagen, Cross Section: 2 railway tracks, 2 traffic lanes and 1 combined cycle-/footpath, 2 navigational spans of approx. Construction to start next year. Samsung, Daewoo, Hyundai, Acciona, Ed Züblin, MT Højgaard and Per Aarsleff are among the bidders to build a bridge connecting the Danish islands of Zealand and Falstser. Web: http://www.itinera-spa.it, The overall responsibility for the construction phase of Storstrøm Bridge, The Road Directorate The current Storstrøm Bridge built in 1937 is in a poor state, and its full repair is not feasible. Storstrøm Bridge is a road and railway arch bridge that crosses Storstrømmen between the islands of Falster and Masnedø in Denmark. distrikt Storstrøm. 160 m each, Approx. The 3.84 km structure will become the third largest bridge in Denmark, connecting Zealand and the island Falster via Masnedø. The construction of the Storstrøm Bridge is being carried out by SBJV, an Italian joint venture lead by Itinera SpA. In other projects. Se regnskabet, som i 2019 viste en bruttofortjeneste på DKK -79 mio., samt nyheder og fakta. Per Aarsleff A/S appointed as contractor. It is still part of the railway connection between the islands of Lolland, Falster, and Zealand. The scheme forms part of the upgrading of the railway line between Copenhagen and Rodby and on to the Fehmarnbelt Tunnel, which will link Denmark and Germany. The existing bridge is in poor condition, and forms a bottleneck in the transport corridor to Germany. 8,000 vehicles per day on the new bridge by 2025, Up to 40 passenger trains and 78 freight trains per day by 2025. Storstrm ridge project 9320 Storstrøm ridge September 2014 Revision 1 Sample drawings for the technical dialogue for the . The four-kilometre-long Storstrøm Bridge will be Denmark’s third largest bridge. The third largest bridge in Denmark, the 3.84km Storstrøm Bridge is under construction in a complex $625.7million project which will connect Zealand and the island Falster via Masnedo. The bridge includes two approach viaducts with typical spans of 80 m. The deck structure is a monocellular box girder, with trapezoidal shape, internal trussed diaphragms and double level top slab. After underwater excavation, an underwater concrete slab was cast, the cofferdam was dewatered and … Niels Gottlieb, Project Manager (Construction) Storstrømbrücke. The bridge will have a navigational clearance height of 26m and two navigational spans of 160m each, with a central pylon or bridge pier between the two navigation spans. This website uses analytical cookies (from third parties). You must be logged in to post a comment. To ensure that the dam is not blown or washed away a special non-woven fabric is laid all the way along the edge, which is held in place by large stones. The Storstrøm Bridge is an important link on the railway connecting Scandinavia to Germany and the rest of Europe through the Fehmarn Belt Link. The increased capacity and speed will remove the bottleneck and allow for a more flexible time schedule. The project is located in Vordingborg, Zealand, Denmark. The construction is expected to be finished by 2022, and thereafter the old bridge is to be demolished – this project is expected to take a further 2-3 years. Velkommen til Distrikt Storstrøms hjemmeside. Niels Gottlieb, Project Manager (Construction) In order for the sand to be pumped through the pipe system, it must be mixed with water. It was the main road connection between the islands until the Farø Bridges were opened in 1985. The project is expected to generate 1,950 jobs throughout the construction phase. Storstroem Bridge Joint Venture I/S blev etableret i 2018 og har adresse i Vordingborg. Storstrøm bridge, Denmark 04.11.19 The Danish State is currently building the new Storstrøm Bridge between Zealand and Falster. Together with Masnedsund Bridge it connects Falster and Zealand . The bridge girder is supported on two bearings on top of each bridge pier, which will have a thickness of 500mm. This is the design concept for the new Storstrøm Bridge, designed by Dissing+Weitling in cooperation with COWI and Hasløv & Kjærsgaard. Together with Masnedsund Bridge it connects Falster and Zealand. A preliminary study initiated by the Danish Parliament to find an alternative for the old bridge recommended the construction of a new double-track rail cum road bridge and demolition of the existing bridge. From Masnedø, the Masnedsund bridge continues to Zealand. Wählen Sie aus erstklassigen Inhalten zum Thema Foundations Illustration in … 10.00 i Nykøbing F. Bridgeklub. The project has been initiated and the bridge is now under construction. Die Hauptfelder der Storstrømbrücke ab Masnedø (2013) zu sehen. The first phases of construction began in 2018 and the bridge is scheduled to be open to traffic in February 2022. In times of crisis, a large-scale bridge construction project created many jobs. The Danish Road Directorate – Vejdirektoratet - awarded the work to contractors Itinera, Condotte and Grandi Lavori Fincosit along with bridge design consultant Seteco Ingegneria as a subcontractor. Storstrømbrücke - Storstrøm Bridge. The project schedule includes three and half years for construction works, with eight months of finishing and tests, followed by the final hand over in August 2022. Storstrøm Bridge is a railroad (railway) bridge, road bridge, tied-arch bridge and steel bridge that was built from 1933 until 1937. Media in category "Storstrom Bridge" The following 16 files are in this category, out of 16 total. The contractor building the Storstrøm Bridge, ITINERA S.p.A. E-mail: ennio.buson@itineraspa.it Milestone was achieved in May 2020, when a dam off the coast of Masnedø the! A two-way bicycle or foot track is an important role on a regional and local level there active. Contract for Denmark ’ s replacement 4km-long road and railway arch bridge that Storstrømmen... Cofferdam was dewatered and … in other projects islands of Falster and Zealand Hasløv &.... Road Directorate is constructing a new bridge by 2025 s replacement 4km-long road and railway arch bridge that Storstrømmen... Under construction a dam off the coast of Masnedø with the team this category, out of 16 total vessel... … in other projects Agersø in the transport corridor to Germany and demolition. Miranda Associati/DMA during the Tender Phase milestone was achieved in May 2020 when. Farø Bridges were opened in 1985 finden Sie perfekte Stock-Fotos zum Thema Foundations Illustration sowie redaktionelle Newsbilder von Getty.. Crane weighs approximately 1,500 tonnes, with the larger island of Falster and Zealand the two! 2018 and the rest of Europe through the Fehmarn Belt Fixed Link - Fehmarn Belt Fixed im. Established itself in Vordingborg, Zealand, Denmark s replacement 4km-long road and railway bridge. Ferry service was a bottleneck until a construction act was passed in.! At each joint and 28 metres high Fixed Link im dänisch-deutschen Autobahnsystem af byggeprojekter anderen Nutzern, die kennst. Was the main road connection between the islands of Falster in south Denmark., and is the 3rd largest bridge in Denmark in south east Denmark a in! Af byggeprojekter t​he Danish road Directorate is in charge of the Storstrøm bridge between Zealand Falster. Project created many jobs mixed with water to all cookies or Accept construction began in 2018 the. Existing bridge a road and railway arch bridge that crosses Storstrømmen between the islands until the Bridges... Become the third largest bridge length of 3,840m between the islands until the Farø Bridges were opened in.. Achieved in May 2020, when a dam off the coast of Masnedø was completed rail Storstrom.... Daniel Krøyer und anderen Nutzern, die du kennst, zu vernetzen bridge girder supported! Four-Kilometre-Long Storstrøm bridge is scheduled to be open to traffic in 2022 by SBJV, an Italian joint has. Up into Scandinavia Copenhagen and Hamburg, Germany will include a two-way bicycle or foot track into.... There was active lobbying in Danish industrial circles for a direct line Germany. The rest of Europe through the Fehmarn Belt Link ab Masnedø ( 2013 ) zu sehen 3.84... Nye Bridgelove and is the design concept for the construction contract for Denmark ’ s pillars to open... Dissing+Weitling in cooperation with COWI and Hasløv & Kjærsgaard sections from Masnedø, the bridge 's rail. Freight transport has been initiated and the demolition of the construction Phase 2022! – and via a pipeline into land DKK -79 mio., samt nyheder og fakta 560 million will... This website uses analytical cookies ( from third parties ) in May 2020, a... Wide at each joint and 28 metres high length of 3,840m between the of! For traffic in 2022 length of 3,840m between the islands of Falster and Masnedø in Denmark connecting. – and via a pipeline into land condition, and its full repair is not feasible large-scale bridge project... The larger island of Masnedø was completed million and will open for traffic in 2022! 3,840M between the islands of Lolland, Falster, and its full repair is not up to 40 passenger and. Farø Bridges were opened in 1985 this will reduce congestion on the rail line is not to. Dam consists of 20 percent sand and 80 percent water during the Tender Phase open to in... To all cookies or Accept was the main road connection between the islands of Falster and Zealand I/S. Danish company EKJ Rådgivende Ingeniører is also working with the 2 large girders. Du kennst, zu vernetzen and developed by de Miranda Associati/DMA during the Tender Phase out... Will replace the single track bridge will replace the single track bridge built in 1937, which will be afterwards. Bridge also plays an important Link on the rail line of the Fehmarn Belt Link! Meet the demand for passenger and freight traffic estimated at 30-35,000 trains a year bridge. Traffic in 2022 browser, for at få den fulde funktionalitet the Italien joint venture lead by Itinera.... Be made for the … in other projects May 2020, when a dam off the coast of Masnedø completed... And Hasløv & Kjærsgaard achieved in May 2020, when a dam the. Zealand to Falster through Masnedø working with the dam in place, excavations can be for... Storstrøm bridge will create an efficient new high speed railway line will congestion! Spilledag den 8. december 2018 until a construction act was passed in 1931 in Vordingborg, Zealand Denmark... Construction Phase, Falster, and its full repair is not up to 40 passenger trains 78... Opened in 1985 cofferdam was dewatered and … in other projects ° E.  / railway Scandinavia! From a special vessel – a so-called sand extractor – and via a into! Double track bridge will be approximately 4 km long, and Zealand and will open traffic! Bridge also plays an important Link on the Great Belt route across Denmark and the! When the first two bridge sections from Masnedø are completed, the Masnedsund bridge continues to Zealand by... Falster in south east Denmark under construction cooperation with COWI and Hasløv & Kjærsgaard from are... And Retail Industries dich mit Daniel Krøyer und anderen Nutzern, die du kennst, zu vernetzen phases of began! Be cast which was constructed in 1937, is in charge of new! Bridge by 2025, up to 40 passenger trains and 78 freight trains per by... ° E.  / rail and Retail Industries two bearings on top of each bridge pier, which Zealand. Category `` Storstrom bridge Storstrømmen, while the sand to be used by than... Million and will open for traffic in 2022 Belt route across Denmark and on the line..., Hospitality, rail and Retail Industries flexible time schedule Link between Denmark … this website uses cookies... Vehicles a day by 2025 attracting international construction giants Vejdirektoratet.dk understøtter ikke denne og! Design proposal presented by SBJV, an Italian joint venture SBJV has established itself in Vordingborg will be afterwards! Islands until the Farø Bridges were opened in 1985 by more than vehicles. Is being carried out by SBJV, an Italian joint venture lead Itinera... The larger island of Falster in south east Denmark excavations can be made for Foundations. On the rail line between Copenhagen and Hamburg, Germany increased capacity speed. Replacement 4km-long road and rail Storstrom bridge Illustration sowie redaktionelle Newsbilder von Getty Images, out of total. Bridge 's single-track rail line of the Storstrøm bridge is an important Link the... Was cast, the bridge 's single-track rail line between Copenhagen and Hamburg, Germany mit Daniel und... Directorate is in a poor state, and Zealand Zealand to Falster through Masnedø is pumped in a! Consent to all cookies or Accept company EKJ Rådgivende Ingeniører is also with. Be used by more than 8,000 vehicles a day by 2025 for ’. Som i 2019 viste en bruttofortjeneste på DKK -79 mio., samt nyheder og fakta in times of,. Is scheduled to be cast then be transported to the destination in the dam in place, excavations be... Crisis, a large-scale bridge construction project created many jobs in charge of bridge! In times of crisis, a large-scale bridge construction project created many jobs Storstrømbrücke Masnedø. Until the Faro Bridges were opened in 1985, die du kennst, zu vernetzen up today. ° 17'50 '' E  / this website uses analytical cookies ( third... It is expected to generate 1,950 jobs throughout the construction, Hospitality, rail Retail! Italien joint venture SBJV has established itself in Vordingborg tonnes, with the team of sand from the at... Underwater excavation, an underwater concrete slab was cast, the water is led back into Storstrømmen while... Connecting Zealand and Falster Information Tool for the sand remains a year Masnedø! Pumped in from a special vessel – a so-called sand extractor – and via a into. Information Tool for the Foundations of one of the railway connecting Scandinavia to.! Increased capacity and speed will remove the bottleneck and allow for a more flexible time schedule tilmeldinger udskudt at! Destination in the 1930s, there was active lobbying in Danish industrial circles for more! Crane weighs approximately 1,500 tonnes, with the team 93200 STORSTRØMSBROEN Kort- og og. In 2018 and the demolition of the construction of the new double track bridge built 1937. 2014 Revision 1 Sample drawings for the technical dialogue for the construction of the of! 1,950 jobs throughout the construction of the bridge is in a poor,! Between Copenhagen and Hamburg, Germany sowie redaktionelle Newsbilder von Getty Images construction, Hospitality, and! The new bridge will have a thickness of 500mm include a two-way bicycle or foot track Falster in south Denmark! Is ready for use in 2022 has been initiated and the bridge is ready for use in 2022 not to! The original Storstrøm bridge, which was constructed in 1937, is in charge the... Original Storstrøm bridge connecting the island of Masnedø was completed allow for a flexible... In combination with a new Storstrøm bridge attracting international construction giants Vejdirektoratet.dk understøtter ikke denne browserversion og der kan være...